On UK-flagged and Red Ensign yachts, risk assessment is a legal duty as well as good practice. It is the base the rest of the safety management system is built on.
Why it matters
⚖️ The legal duty
The Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997 (SI 1997/2962), regulation 7, require a suitable and sufficient assessment of the risks to workers' health and safety.
📘 MCA guidance
MGN 636 (M), as amended, says risk assessment should underpin all safety measures. Chapter 1 of COSWP sets out the basic requirements on board.
⚓ ISM Code
Clause 1.2.2.2 requires the company to assess all identified risks to its ships, personnel and the environment, and to establish safeguards against them.
Key terms
| Hazard | Anything with the potential to cause harm, such as a wet deck, a mooring line under load, or an enclosed space. |
|---|---|
| Risk | How likely that harm is, combined with how bad it would be. |
| Control measure | What you do to bring the risk down. |
| ALARP | “As low as reasonably practicable”, the target level of residual risk. |
The five steps on board
- Identify the hazards. Walk the task with the crew who actually do it: deck, engine room, galley, tender ops, guest activities.
- Decide who could be harmed and how. Include crew, guests, contractors and shore staff.
- Evaluate the risk. Score likelihood × severity on a simple matrix (see below). Record the score before and after the controls.
- Apply controls in order: eliminate, substitute, engineer, set procedures or permits, then PPE last.
- Record, brief and review. Brief the crew, file the assessment in the SMS, and review it after any incident, near miss, change of equipment or crew, or at least once a year.
Example 5 × 5 risk matrix
| Likelihood ↓ / Severity → | 1 Minor | 2 Moderate | 3 Serious | 4 Major | 5 Catastrophic |
|---|---|---|---|---|---|
| 5 Almost certain | 5 | 10 | 15 | 20 | 25 |
| 4 Likely | 4 | 8 | 12 | 16 | 20 |
| 3 Possible | 3 | 6 | 9 | 12 | 15 |
| 2 Unlikely | 2 | 4 | 6 | 8 | 10 |
| 1 Rare | 1 | 2 | 3 | 4 | 5 |
1–4 Low acceptable with existing controls · 5–9 Medium reduce to ALARP, master's review · 10–25 High do not start until further controls are in place
Typical yacht assessments
Mooring and anchoring Tender and toy launch and recovery Working aloft and overside Enclosed space entry Hot work Bunkering and fuel transfer Galley operations Guest water sports Heavy weather passage Lone working on watch
Generic versus task-specific
Generic assessment
For routine work that is done the same way every time. Kept in the SMS and reviewed on schedule.
Task-specific assessment
Added when conditions change: night operations, poor weather, a new crew member or unfamiliar equipment. Usually linked to a permit to work.
Linking it to our SMS tools
Each assessment should reference the related equipment in the Asset Register. Controls that need maintenance go into the PM Task list. Any Defect Report or near miss should trigger a review of the assessment it relates to. That closes the loop the ISM Code expects.
Brainstorm: open questions
- Should every PM task carry a link to its risk assessment?
- Do we want a single 5 × 5 matrix across the fleet, or one per vessel?
- How do we capture crew sign-off on briefings digitally?
Sources
- The Merchant Shipping and Fishing Vessels (Health and Safety at Work) Regulations 1997
- Health and safety on ships: risk assessments (gov.uk)