# Sailing Yacht Safety Management and Maintenance Journal
Starter template for a 24-metre sailing yacht. This is a working document, not a compliance determination or an approved maintenance schedule. Copy each register into its own tab in a shared spreadsheet if preferred, and keep an offline copy of the current schedule and safety-critical instructions aboard.
## Vessel profile and scope
| Field | Yacht details |
|---|---|
| Vessel name, flag and registration | |
| Length overall and certified load-line length, with document reference | |
| Gross tonnage, year built and current code/class certificates | |
| Private or commercial/charter, maximum passenger count | |
| Operating areas and voyage limits | |
| Skipper, maintenance lead and shore contact | |
| Applicable rules confirmed by, date and evidence | |
| System version, approver and review date | |
Confirm the applicable regime with the flag administration or its authorised surveyor before treating the system as compliant. For qualifying UK commercial sport or pleasure vessels, the UK regulations distinguish less than 24 m load-line length from 24 m and above, subject to the regulations’ scope and definitions ([UK Merchant Shipping Regulations 2025](https://www.legislation.gov.uk/uksi/2025/1195/note/made)). Where REG Yacht Code Part A applies and the vessel is below 500 GT, Chapter 23A describes the safety management system ([REG Yacht Code, Part A, Chapter 23A](https://www.redensigngroup.org/media/wrmhluof/reg-yc-january-2024-edition-part-a-including-corrigenda-no1.pdf)).
## Safety management manual
Keep a short, version-controlled onboard manual linked to the journal. Start with these sections and adapt them to the confirmed rules and yacht:
- **Responsibilities:** Record the skipper’s authority, who owns maintenance, who approves tasks and who can be called ashore.
- **Safe operations:** Link risk assessments and checklists for passage preparation, heavy-weather sailing, deck work, working aloft, machinery isolation and other relevant operations.
- **Emergencies and drills:** Link emergency procedures and a drill log. Include dates, participants, lessons, actions and closure evidence. Consider fire, flooding, person overboard, steering failure, rig damage, abandon ship and emergency towing.
- **Incidents and defects:** Record what happened, who was notified, actions taken and who verified closure. The skipper assesses any operational restrictions and records the decision.
- **Document control:** Link approved versions, brief the crew when procedures change, and retain an offline copy of essential documents. Set a review schedule appropriate to the yacht and its applicable requirements.
## Maintenance journal
Use stable IDs to connect records. Keep each completed work entry as a separate record; correcting a mistake should leave a trace rather than erase the original history.
### Equipment register
| Asset ID | System and location | Item | Make/model/serial | Critical? Why? | Nameplate/photo ref | Manual ref | Service provider/owner | Identity status |
|---|---|---|---|---|---|---|---|---|
| ENG-01 | Propulsion / engine room | Main engine | Pending onboard check | Skipper to assess | Pending | Pending | TBD | Identity unverified |
Walk the boat before searching for manuals. Start with rig and standing rigging, steering and emergency steering, bilge pumps and alarms, seacocks and watertight closures, propulsion, electrical and emergency power, fire protection, lifesaving equipment, distress communications and anchoring. Add only equipment actually fitted. Give separately serviced units their own IDs.
### Source register
| Source ID | Asset or rule | Issuer and document title | Revision/date | Model or serial applicability | Page/section | URL or onboard file reference | Verified by/date |
|---|---|---|---|---|---|---|---|
| | | | | | | | |
Keep the exact manufacturer manual and relevant service bulletins; for statutory, class or survey conditions retain the applicable rule or written instruction. Where sources conflict or do not clearly apply, leave the task pending and obtain written clarification. An invoice may document prior work without establishing the next required interval.
### Planned maintenance
| Task ID | Asset ID | Work or check | Trigger(s) | Last verified date/hours | Next due date/hours | Crew or authorised service | Source/page | Reviewer/date | Status |
|---|---|---|---|---|---|---|---|---|---|
| M-ENG-01 | ENG-01 | Engine oil and filter service | Pending exact manual | Unknown | Not set | Pending review | Pending | Not approved | Needs verification |
Write one row per task. Record the trigger as published: calendar, running hours, event, condition or a combination. Use “whichever comes first” only when supported by the requirement. For example, keep a separate row for a crew check and a separate row for a service-provider job, even when they refer to the same asset. Store acceptance criteria and any approved job card with the task. An unknown service baseline is not a reset date; verify the history or have the skipper and qualified maintainer decide the next action.
### Work history
| Job ID | Task/asset ID | Date/hours | Work done and result | Parts/readings | Performed by | Verified by | Evidence ref | Follow-up defect ID |
|---|---|---|---|---|---|---|---|---|
| | | | | | | | | |
Record partial and failed work honestly. Close only after the required work and checks are complete and evidenced. Advance the next due date or hours only after the completion has been accepted, preserving any fixed expiry or survey date.
### Defects and corrective actions
| Defect ID | Asset ID | Found when/by | Defect and impact | Interim action or restriction | Owner and target date | Repair and retest evidence | Closed by/date |
|---|---|---|---|---|---|---|---|
| | | | | | | | |
Notify the skipper immediately of a critical failure or a safety-critical item with uncertain serviceability. Do not let a reminder, spreadsheet or agent decide whether the yacht can depart. Keep an open-defects and due-work view for pre-departure and handovers.
## Agent roles and copyable instructions
- **Inventory agent:** “From the supplied nameplate photos, equipment list and service papers, return one proposed asset record per fitted unit. Include the evidence reference for every identification. Mark unreadable, missing or conflicting details ‘needs onboard check’; do not infer the model or serial number.”
- **Manual and rules researcher:** “For each verified asset, find the official manufacturer documentation and applicable bulletins. Return issuer, title, revision, page, URL and exact model/serial applicability. Separately list potential statutory, class or survey references for the reviewer to confirm. Mark ambiguous matches and do not use forums or a similar-model manual to set an interval.”
- **Maintenance journal agent:** “Turn verified source passages into draft tasks. For each task return asset ID, task description, trigger, source ID/page, acceptance criteria if stated, and whether a qualified service provider is specified. Flag unknown baselines, conflicting intervals and special safety conditions. Do not invent values, approve tasks, alter approved records or sign off work.”
Give agents read access to the necessary inputs and write access only to drafts. Do not send marina access information, logins or unrelated personal details to the agents.
## Review and rollout
1. **Confirm scope:** Collect the yacht’s registration and coding documents. Record the certified measurements, use and operating area rather than assuming the advertised dimensions determine the regime.
2. **Pilot:** Pick a few critical assets, for example the main engine, standing rigging, bilge pump/alarm, emergency steering and liferaft, if fitted. Capture nameplates, dates, certificates and available service records.
3. **Approve:** The skipper or designated maintenance lead checks identity, source applicability, trigger, service eligibility and last verified baseline. Refer technical or statutory uncertainties to the appropriate competent specialist or surveyor. Only a human moves a task into the live schedule.
4. **Operate:** Record meter readings and work as it happens. Review due and overdue items together with upcoming voyages, and keep a backup. Review source revisions when equipment is replaced or new instructions are issued.
For the maintenance principles behind these registers, see [IMO ISM Code, section 10](https://wwwcdn.imo.org/localresources/en/KnowledgeCentre/IndexofIMOResolutions/AssemblyDocuments/A.741(18).pdf) and the [IMO’s ISM Code overview and amendments](https://www.imo.org/en/ourwork/humanelement/pages/ismcode.aspx).