NSS - Nautical Services by Sailingtarget
  • SailingTarget
  • Home
Sign In
  • Prompting
  • MCA Approved Engine Course 2 (AEC 2)
  • Minimal ISM structure
  • SYSM and Maintenance Journal

ISM WEB

  • MCA Approved Engine Course 2 (AEC 2)

  • Minimal ISM structure

  • SYSM and Maintenance Journal

MCA Approved Engine Course 2 (AEC 2)

Capt. Marco ISM WebSite 27 November 2026

MCA Approved Engine Course 2 (AEC 2)

Here is a 50-question practice assessment designed around the MCA Approved Engine Course 2 (AEC 2) syllabus—covering vapour-compression refrigeration, MARPOL and safe working practices, maintenance and condition monitoring, enclosed spaces, lifting/slinging, electrical distribution, basic hydraulics, and fresh water/sewage systems.

(Note: Official MCA AEC 2 assessments combine practical evaluations and written testing at an approved training centre; use this quiz to test your theoretical recall and fault-finding reasoning.)

Section 1: Vapour-Compression Refrigeration Systems (Q1–Q7)

1. In a standard vapour-compression refrigeration cycle, what is the state of the refrigerant immediately after leaving the compressor?

  • A) Low-pressure, low-temperature liquid

  • B) High-pressure, high-temperature superheated vapour

  • C) Low-pressure, high-temperature wet vapour

  • D) High-pressure, low-temperature subcooled liquid

2. Which component rejects heat from the refrigerant to the surrounding cooling medium (sea water or air)?

  • A) Expansion valve

  • B) Evaporator

  • C) Condenser

  • D) Filter-drier

3. What happens to the refrigerant as it passes through a thermostatic expansion valve (TXV)?

  • A) Its pressure increases and its temperature rises

  • B) Its pressure drops sharply, causing partial flashing and a drop in saturation temperature

  • C) It condenses completely into a high-pressure liquid

  • D) Its mass flow rate is locked regardless of evaporator load

4. Where in the refrigeration circuit does the refrigerant absorb heat from the refrigerated space?

  • A) Condenser

  • B) Receiver

  • C) Evaporator

  • D) Compressor discharge line

5. Non-condensable gases (such as air) trapped in a refrigeration system typically cause:

  • A) Abnormally low condenser pressure and freezing at the expansion valve

  • B) Abnormally high condenser pressure and reduced cooling efficiency

  • C) Complete stoppage of the liquid line solenoid

  • D) Lower compressor discharge temperatures

6. What is the primary role of a filter-drier in a marine refrigeration plant?

  • A) Increase refrigerant velocity before the compressor

  • B) Trap solid debris and absorb moisture to prevent acid formation and ice blockages

  • C) Regulate sea water flow across the condenser

  • D) Separate lubricating oil from the suction line

7. When recovering, charging, or disposing of refrigerant on board, what must be observed?

  • A) Venting small quantities directly to the atmosphere is acceptable in open sea

  • B) Relevant environmental/F-gas regulations, using proper recovery equipment and authorised disposal routes

  • C) Topping up with any available refrigerant regardless of type

  • D) Flushing the system with fresh water before charging

Section 2: Legislation, Records & Safe Working Practices (Q8–Q16)

8. Under MARPOL Annex I, which device monitors oil content in bilge water discharged overboard?

  • A) Oily Water Separator (OWS) with an oil content meter / 15 ppm alarm and automatic stopping/diverting arrangement

  • B) Sewage comminutor

  • C) Bilge keel strainer

  • D) Fuel oil centrifuge

9. Which MARPOL Annex primarily addresses the prevention of pollution by sewage from ships?

  • A) Annex I

  • B) Annex IV

  • C) Annex V

  • D) Annex VI

10. Which MARPOL Annex covers prevention of air pollution from ships (such as SOx, NOx, and fuel sulphur limits)?

  • A) Annex II

  • B) Annex IV

  • C) Annex VI

  • D) Annex III

11. Which MARPOL Annex deals with garbage management and garbage record keeping?

  • A) Annex I

  • B) Annex III

  • C) Annex V

  • D) Annex VI

12. What is the primary purpose of a Permit to Work (PTW) system before mechanical or electrical maintenance?

  • A) To replace the ship's planned maintenance schedule

  • B) To formally verify hazards are controlled, isolations are in place, and safe conditions are authorised before work starts

  • C) To record daily fuel consumption

  • D) To clear alarms on the main switchboard

13. According to the hierarchy of risk control in safe working practices (e.g., Code of Safe Working Practices), which control is generally preferred over relying solely on Personal Protective Equipment (PPE)?

  • A) Relying on hearing defenders instead of guarding moving parts

  • B) Eliminating or substituting the hazard, or engineering controls/guarding where possible

  • C) Working faster to reduce exposure time

  • D) Posting a warning sign without isolating power

14. Where should you look for specific hazard, handling, first-aid, and spill response information for a chemical or cleaning agent used in the engine room?

  • A) The vessel trim and stability booklet

  • B) The Material Safety Data Sheet (MSDS / SDS)

  • C) The compass deviation card

  • D) The deck logbook

15. Which operational record tracks machinery running hours, watch observations, fluid levels, and abnormal events in the machinery space?

  • A) Engine Room Logbook

  • B) Cargo Manifest

  • C) Crew Muster List

  • D) Port Clearance Certificate

16. Why are accurate fuel, lubricating oil, and chemical consumption records important on board?

  • A) They replace the need for physical dipstick checks

  • B) They help detect leaks, abnormal consumption, and treatment imbalances, while supporting regulatory compliance

  • C) They determine hull speed directly

  • D) They eliminate the need for oil analysis

Section 3: Maintenance Systems & Condition Monitoring (Q17–Q23)

17. What is the main difference between Planned Maintenance (PMS) and Condition-Based Monitoring (CBM)?

  • A) PMS never uses intervals; CBM only uses calendar dates

  • B) PMS schedules tasks at set intervals/hours, whereas CBM uses measurements/inspections to assess actual equipment condition and trends

  • C) CBM replaces all safety checks

  • D) PMS applies only to deck gear

18. Why is comparing a current measurement against a baseline ("datum") reading valuable in condition monitoring?

  • A) A single isolated number always proves a fault

  • B) Tracking deviations from baseline over time reveals gradual wear or degradation before failure occurs

  • C) Datum readings allow you to skip maintenance intervals

  • D) It removes the need for calibration

19. Lubricating oil analysis can help detect:

  • A) Bearing wear metals, fuel dilution, water contamination, and oil degradation

  • B) Alternator frequency drift

  • C) Hull paint thickness

  • D) Anchor chain link elongation

20. Which condition monitoring technique uses an optical/video probe to inspect internal cavities (such as cylinders, gearboxes, or valves) without major strip-down?

  • A) Endoscope (borescope) inspection

  • B) Thermographic survey

  • C) Insulation resistance test

  • D) Vibration spectrum analysis

21. An infrared thermographic survey on an electrical panel or bearing is most useful for spotting:

  • A) Low coolant pH

  • B) Abnormal hot spots caused by loose connections, high resistance, or friction/lubrication issues

  • C) Dissolved oxygen levels

  • D) Fuel cetane number

22. When taking an insulation resistance ("megger") reading on an electrical motor or circuit, what is critical?

  • A) The circuit must be isolated, proved dead, and safe to test at the appropriate test voltage

  • B) The motor should be running at full load

  • C) The battery charger must remain connected across the windings

  • D) Test with wet hands for better contact

23. Rising broadband or specific frequency vibration on a rotating pump or fan typically points toward:

  • A) Misalignment, unbalance, worn bearings, or looseness

  • B) Excess fresh water tank capacity

  • C) Correct shaft alignment

  • D) Clean strainer baskets

Section 4: Enclosed Spaces & Lifting / Slinging (Q24–Q30)

24. Which of the following is an example of a potential enclosed space on a vessel?

  • A) An open aft deck in daylight

  • B) A cofferdam, void space, fuel/water tank, or poorly ventilated bilge compartment

  • C) A well-ventilated bridge wing

  • D) A standard open workshop bench

25. Which gas detector is mandatory when testing an enclosed space atmosphere prior to entry?

  • A) An oxygen detector (to verify safe oxygen levels, typically around 20.9% by volume)

  • B) A refrigerant leak sniffer only

  • C) A carbon monoxide detector only

  • D) A smoke detector

26. Why is entry into an enclosed space hazardous even if no flammable gas is present?

  • A) Oxygen depletion (e.g., due to rusting/oxidation or inerting) or toxic gases can cause rapid unconsciousness or death

  • B) Paint dries faster in enclosed spaces

  • C) Radio signals are stronger inside tanks

  • D) Air pressure is always higher inside voids

27. Before lifting a load manually or with lifting gear, what should be checked first?

  • A) The weight and centre of gravity of the load, the route/landing area, and the rated Safe Working Load (SWL) / Working Load Limit (WLL) of the equipment

  • B) Only the colour of the sling

  • C) Whether the main engine is running at full ahead

  • D) If the bilge alarm is muted

28. How should lifting gear (such as slings, shackles, chain blocks, or overhead cranes) be managed with respect to inspections and markings?

  • A) Use any unlabelled gear found in a locker

  • B) Ensure equipment is inspected, properly marked/tagged with SWL/WLL and certification records, and removed from service if damaged or defective

  • C) Exceed SWL slightly for short lifts

  • D) Store wire slings submerged in bilge water

29. When using a trolley, skates, pull lift, or overhead crane to move a load (such as a 50 kg component), what is good safe practice?

  • A) Stand directly under suspended loads

  • B) Keep hands clear of pinch points, move smoothly with a controlled tag/guide approach, and never walk or stand beneath suspended loads

  • C) Swing the load rapidly to gain momentum

  • D) Leave a suspended load unattended

30. When manually lifting a load from the floor, which technique reduces back strain?

  • A) Keep back rounded, twist while lifting, and hold the load far from the body

  • B) Position feet apart, bend at the knees/hips while keeping the back straight, hold the load close to the body, and avoid twisting

  • C) Jerk the load upward quickly

  • D) Lift with one hand at arm's length

Section 5: Electrical Distribution Systems (Q31–Q38)

31. Before working on an electrical circuit or panel, what sequence of isolation actions is essential?

  • A) Isolate the supply, lock out / tag out (LOTO), and prove dead using a suitable voltage indicator / proving unit

  • B) Switch off the lighting breaker only

  • C) Disconnect the shore power cable while the generator is paralleled

  • D) Remove PPE so you can feel for warmth

32. What is the function of a circuit breaker or fuse in an electrical distribution system?

  • A) To step up DC voltage to AC voltage

  • B) To protect conductors and equipment by interrupting excessive current (overload or short circuit)

  • C) To charge lead-acid batteries from 12 V DC

  • D) To cool the alternator windings

33. What is the purpose of an earth leakage / Residual Current Device (RCD / ground fault protection)?

  • A) To increase generator power output

  • B) To detect imbalance between live and neutral currents (leakage to earth) and trip quickly to reduce electric shock and fire risk

  • C) To regulate battery specific gravity

  • D) To start diesel engines automatically

34. Before closing the breaker to parallel two AC generators onto a common busbar, which conditions must match?

  • A) Voltage, frequency, phase sequence, and phase angle (synchronism)

  • B) Fuel tank level and lube oil colour

  • C) Bilge pump state and fresh water pressure

  • D) Exhaust temperature and sea chest valve position

35. What is Portable Appliance Testing (PAT) on board used for?

  • A) Testing hydraulic relief valve cracking pressure

  • B) Visually inspecting and electrically testing portable appliances (e.g., leads, plugs, earth continuity, insulation) and recording/tagging results

  • C) Measuring sea water salinity

  • D) Checking engine compression pressure

36. When using a digital multimeter (AVO meter) to measure voltage on a live circuit, what must you verify first?

  • A) That the meter is set to the correct AC or DC voltage range and leads are in the proper input jacks (not current/amps jacks)

  • B) That the continuity buzzer is selected

  • C) That the battery is disconnected

  • D) That the leads are shorted together

37. Why must marine battery banks be kept in well-ventilated spaces and protected against short circuits?

  • A) Charging batteries can release explosive hydrogen gas, and high-current DC short circuits can cause severe arcing, burns, or fire

  • B) Batteries lose voltage if kept dry

  • C) Ventilation increases internal resistance

  • D) Short circuits recharge cells faster

38. How is a vessel safely isolated from shore electrical power prior to getting underway?

  • A) Open/isolate the shore breaker on board and ashore as appropriate, disconnect the shore cable safely, and verify changeover to ship's generation

  • B) Pull the cable out of the shore pedestal while under load

  • C) Start the main propulsion engine without switching loads

  • D) Switch off the emergency bilge pump

Section 6: Basic Hydraulics & Practical Maintenance (Q39–Q44)

39. In a basic hydraulic system, what is the primary function of the hydraulic pump?

  • A) Convert mechanical input power into hydraulic fluid flow (creating pressure when flow meets resistance)

  • B) Convert hydraulic fluid pressure into rotary or linear mechanical output

  • C) Cool the hydraulic reservoir

  • D) Filter out water automatically

40. What is the role of a relief valve in a hydraulic circuit?

  • A) To control cylinder speed during normal extension

  • B) To limit maximum system pressure and protect components/lines from overpressure

  • C) To bleed air out of the pump casing

  • D) To heat cold hydraulic oil

41. Why is cleanliness and fluid/filter maintenance critical in hydraulic systems?

  • A) Hydraulic systems run on seawater

  • B) Fine contaminants and degraded fluid cause spool sticking, pump/valve wear, and erratic operation

  • C) Dirty oil improves seal lubrication

  • D) Filters are only needed during initial commissioning

42. When reading a hydraulic schematic/drawing, what do component symbols represent?

  • A) Physical dimensions and paint colours

  • B) Functional components (pumps, valves, actuators, reservoirs, lines) and flow paths

  • C) Crew watch schedules

  • D) Vessel stability curves

43. When fitting a split pin (cotter pin) with a castellated/slotted nut or clevis pin, what is required?

  • A) Leave the pin straight so it slides out easily

  • B) Fit a pin of suitable size/material, pass it cleanly through the hole/slots, and bend/spread the legs securely without damaging the pin

  • C) Use a nail instead if a split pin is unavailable

  • D) Over-tighten the nut until the pin shears

44. Before opening a fuel supply line or pressurised water line for maintenance, what isolation steps are required?

  • A) Shut off/isolate relevant valves, relieve residual pressure safely, catch any residual fluid/drips, and apply tags/LOTO where appropriate

  • B) Open the system immediately while pumps are running

  • C) Remove all guards after starting the engine

  • D) Drain the lube oil sump

Section 7: Fresh Water & Sewage Systems (Q45–Q50)

45. What is a key requirement for potable (fresh) water storage and treatment systems on board?

  • A) Store drinking water in the greywater tank

  • B) Keep tanks clean, properly vented/protected from contamination, and maintain appropriate disinfection/treatment and monitoring

  • C) Connect potable water lines directly to the bilge manifold

  • D) Avoid periodic cleaning or inspection

46. What is the purpose of a fresh water generator (watermaker) on a vessel?

  • A) To produce fresh water from seawater (e.g., via vacuum distillation or reverse osmosis)

  • B) To pump black water ashore

  • C) To compress starting air

  • D) To cool the main engine exhaust manifold

47. In a marine sewage treatment plant, why is monitoring aeration/dissolved oxygen or chemical dosing (such as chlorine/disinfectant) important?

  • A) It increases fuel octane rating

  • B) Biological treatment requires adequate oxygen/microbial health, and disinfection controls pathogens/odour to meet discharge standards

  • C) It prevents sea chest fouling

  • D) It adjusts rudder angle

48. What happens if a sewage holding tank vents become blocked during pump-out or filling?

  • A) Tank pressure can build up or create a vacuum, risking tank damage, seal leaks, or back-pressure issues

  • B) The tank automatically empties overboard

  • C) Water temperature rises to boiling point

  • D) Filter elements regenerate

49. Why is backflow / cross-connection prevention essential between non-potable systems (such as grey/black water or technical water) and potable water?

  • A) To prevent contamination of drinking water supplies

  • B) To save on pipe fittings

  • C) To increase pump head

  • D) To reduce noise in cabins

50. When carrying out routine checks on auxiliary pumps (fresh water, circulating, or transfer pumps), which combination of checks is good practice?

  • A) Check for unusual noise/vibration, gland/seal leaks, pressure/flow indications, motor temperature, and valve positions

  • B) Check only the paintwork

  • C) Run dry for 30 minutes to clear air

  • D) Close discharge valves completely while running

Answer Key & Concise Rationales

  1. B — Compressors raise refrigerant pressure and temperature as a superheated vapour before condensation.

  2. C — The condenser rejects heat from the refrigerant to sea water or air.

  3. B — Throttling across the expansion valve drops pressure and lowers saturation temperature.

  4. C — The evaporator absorbs heat as the low-pressure refrigerant evaporates.

  5. B — Non-condensables occupy condenser space and raise head pressure above normal.

  6. B — Filter-driers remove particulates and moisture that cause corrosion/acid and freeze-ups.

  7. B — Refrigerants must be handled and recovered/disposed of in line with environmental rules.

  8. A — MARPOL Annex I governs oily bilge discharges, typically using an OWS with a 15 ppm monitor/alarm.

  9. B — MARPOL Annex IV addresses sewage pollution prevention.

  10. C — MARPOL Annex VI covers air pollution prevention from ships.

  11. C — MARPOL Annex V governs garbage management and record keeping.

  12. B — A PTW formalises hazard controls, isolations, and authorisation before work begins.

  13. B — Elimination, substitution, and engineering controls sit higher in risk control than PPE alone.

  14. B — MSDS/SDS documents detail chemical hazards, PPE, first aid, and spill actions.

  15. A — The Engine Room Logbook records watchkeeping data, hours, fluid levels, and events.

  16. B — Consumption tracking highlights anomalies/leaks and supports compliance.

  17. B — PMS is interval/hour-based; CBM evaluates condition via testing/inspection.

  18. B — Comparing current readings to baseline/datum shows trends and developing faults.

  19. A — Oil analysis reveals wear debris, fuel/water ingress, and oil condition.

  20. A — An endoscope/borescope inspects internal spaces visually without full disassembly.

  21. B — Thermography highlights abnormal heat from high resistance, loose connections, or friction.

  22. A — Insulation testing requires isolation and proving dead before applying test voltage.

  23. A — Vibration changes often indicate misalignment, unbalance, bearing wear, or looseness.

  24. B — Voids, cofferdams, tanks, and poorly ventilated spaces are classic enclosed spaces.

  25. A — Oxygen testing is mandatory before enclosed space entry.

  26. A — Low oxygen or toxic atmospheres can incapacitate entrants even without flammable gas.

  27. A — Assess load weight/centre of gravity, path, and SWL/WLL ratings before lifting.

  28. B — Lifting gear requires inspection, clear SWL/WLL markings/records, and quarantine if defective.

  29. B — Never stand/walk under suspended loads; control loads smoothly and watch pinch points.

  30. B — Lift with legs/straight back, keep load close, and avoid twisting.

  31. A — Isolate, apply LOTO, and prove dead before touching electrical parts.

  32. B — Breakers and fuses protect against overcurrent and short circuits.

  33. B — RCD/earth-leakage devices trip on leakage to earth to reduce shock and fire hazards.

  34. A — Paralleling AC generators requires matching voltage, frequency, phase sequence, and phase angle.

  35. B — PAT involves inspecting and testing portable electrical equipment and recording/tagging it.

  36. A — Check range and lead sockets before measuring voltage so you don't short the circuit or damage the meter.

  37. A — Battery spaces need ventilation for hydrogen gas, and DC circuits need protection against high-current shorts.

  38. A — Isolate shore power cleanly and confirm ship's supply before departing.

  39. A — Hydraulic pumps generate flow; pressure builds when flow meets resistance.

  40. B — Relief valves cap maximum pressure to protect the system from overpressure.

  41. B — Cleanliness and proper filtration prevent wear, valve sticking, and hydraulic faults.

  42. B — Schematic symbols show components and flow paths.

  43. B — Fit an appropriate split pin and bend/spread legs securely without damaging the pin.

  44. A — Isolate, depressurise, contain residual fluid, and tag/lock out before breaking lines.

  45. B — Potable water systems require clean storage, protection from contamination, and treatment/monitoring.

  46. A — Watermakers produce fresh water from seawater.

  47. B — Proper aeration/oxygen and disinfection keep biological/chemical treatment effective and compliant.

  48. A — Blocked vents can cause pressure/vacuum stress, leaks, or pump-out issues.

  49. A — Preventing cross-connections/backflow protects potable water from contamination.

  50. A — Routine pump checks cover noise/vibration, leaks, pressures/flows, temperatures, and valve status.

Minimal ISM structure

Capt. Marco ISM WebSite 20 November 2026
Section What it contains
Safety and environmental policy Owner/captain commitment to safe operation, crew safety, pollution prevention
Responsibilities Owner, captain/master, engineer/crew, shore agent, service contractors
Critical equipment list Systems whose failure can endanger people, navigation, or the environment
Maintenance policy Inspection intervals, manufacturer instructions, defect reporting, spare parts
Operational procedures Departure checks, underway checks, mooring, heavy weather, emergency drills
Emergency preparedness Fire, flooding, man overboard, grounding, medical, pollution, loss of steering/propulsion
Non-conformity and corrective action How defects are logged, prioritised, assigned, closed, and verified
Records and audits Maintenance journal, drills, inspections, internal review, document control
Agents and suppliers Contact details, scope of authority, response expectations

 

SYSM and Maintenance Journal

Capt. Marco ISM WebSite 20 November 2026

# Sailing Yacht Safety Management and Maintenance Journal

Starter template for a 24-metre sailing yacht. This is a working document, not a compliance determination or an approved maintenance schedule. Copy each register into its own tab in a shared spreadsheet if preferred, and keep an offline copy of the current schedule and safety-critical instructions aboard.

## Vessel profile and scope

| Field | Yacht details |
|---|---|
| Vessel name, flag and registration | |
| Length overall and certified load-line length, with document reference | |
| Gross tonnage, year built and current code/class certificates | |
| Private or commercial/charter, maximum passenger count | |
| Operating areas and voyage limits | |
| Skipper, maintenance lead and shore contact | |
| Applicable rules confirmed by, date and evidence | |
| System version, approver and review date | |

Confirm the applicable regime with the flag administration or its authorised surveyor before treating the system as compliant. For qualifying UK commercial sport or pleasure vessels, the UK regulations distinguish less than 24 m load-line length from 24 m and above, subject to the regulations’ scope and definitions ([UK Merchant Shipping Regulations 2025](https://www.legislation.gov.uk/uksi/2025/1195/note/made)). Where REG Yacht Code Part A applies and the vessel is below 500 GT, Chapter 23A describes the safety management system ([REG Yacht Code, Part A, Chapter 23A](https://www.redensigngroup.org/media/wrmhluof/reg-yc-january-2024-edition-part-a-including-corrigenda-no1.pdf)).

## Safety management manual

Keep a short, version-controlled onboard manual linked to the journal. Start with these sections and adapt them to the confirmed rules and yacht:

- **Responsibilities:** Record the skipper’s authority, who owns maintenance, who approves tasks and who can be called ashore.
- **Safe operations:** Link risk assessments and checklists for passage preparation, heavy-weather sailing, deck work, working aloft, machinery isolation and other relevant operations.
- **Emergencies and drills:** Link emergency procedures and a drill log. Include dates, participants, lessons, actions and closure evidence. Consider fire, flooding, person overboard, steering failure, rig damage, abandon ship and emergency towing.
- **Incidents and defects:** Record what happened, who was notified, actions taken and who verified closure. The skipper assesses any operational restrictions and records the decision.
- **Document control:** Link approved versions, brief the crew when procedures change, and retain an offline copy of essential documents. Set a review schedule appropriate to the yacht and its applicable requirements.

## Maintenance journal

Use stable IDs to connect records. Keep each completed work entry as a separate record; correcting a mistake should leave a trace rather than erase the original history.

### Equipment register

| Asset ID | System and location | Item | Make/model/serial | Critical? Why? | Nameplate/photo ref | Manual ref | Service provider/owner | Identity status |
|---|---|---|---|---|---|---|---|---|
| ENG-01 | Propulsion / engine room | Main engine | Pending onboard check | Skipper to assess | Pending | Pending | TBD | Identity unverified |

Walk the boat before searching for manuals. Start with rig and standing rigging, steering and emergency steering, bilge pumps and alarms, seacocks and watertight closures, propulsion, electrical and emergency power, fire protection, lifesaving equipment, distress communications and anchoring. Add only equipment actually fitted. Give separately serviced units their own IDs.

### Source register

| Source ID | Asset or rule | Issuer and document title | Revision/date | Model or serial applicability | Page/section | URL or onboard file reference | Verified by/date |
|---|---|---|---|---|---|---|---|
| | | | | | | | |

Keep the exact manufacturer manual and relevant service bulletins; for statutory, class or survey conditions retain the applicable rule or written instruction. Where sources conflict or do not clearly apply, leave the task pending and obtain written clarification. An invoice may document prior work without establishing the next required interval.

### Planned maintenance

| Task ID | Asset ID | Work or check | Trigger(s) | Last verified date/hours | Next due date/hours | Crew or authorised service | Source/page | Reviewer/date | Status |
|---|---|---|---|---|---|---|---|---|---|
| M-ENG-01 | ENG-01 | Engine oil and filter service | Pending exact manual | Unknown | Not set | Pending review | Pending | Not approved | Needs verification |

Write one row per task. Record the trigger as published: calendar, running hours, event, condition or a combination. Use “whichever comes first” only when supported by the requirement. For example, keep a separate row for a crew check and a separate row for a service-provider job, even when they refer to the same asset. Store acceptance criteria and any approved job card with the task. An unknown service baseline is not a reset date; verify the history or have the skipper and qualified maintainer decide the next action.

### Work history

| Job ID | Task/asset ID | Date/hours | Work done and result | Parts/readings | Performed by | Verified by | Evidence ref | Follow-up defect ID |
|---|---|---|---|---|---|---|---|---|
| | | | | | | | | |

Record partial and failed work honestly. Close only after the required work and checks are complete and evidenced. Advance the next due date or hours only after the completion has been accepted, preserving any fixed expiry or survey date.

### Defects and corrective actions

| Defect ID | Asset ID | Found when/by | Defect and impact | Interim action or restriction | Owner and target date | Repair and retest evidence | Closed by/date |
|---|---|---|---|---|---|---|---|
| | | | | | | | |

Notify the skipper immediately of a critical failure or a safety-critical item with uncertain serviceability. Do not let a reminder, spreadsheet or agent decide whether the yacht can depart. Keep an open-defects and due-work view for pre-departure and handovers.

## Agent roles and copyable instructions

- **Inventory agent:** “From the supplied nameplate photos, equipment list and service papers, return one proposed asset record per fitted unit. Include the evidence reference for every identification. Mark unreadable, missing or conflicting details ‘needs onboard check’; do not infer the model or serial number.”
- **Manual and rules researcher:** “For each verified asset, find the official manufacturer documentation and applicable bulletins. Return issuer, title, revision, page, URL and exact model/serial applicability. Separately list potential statutory, class or survey references for the reviewer to confirm. Mark ambiguous matches and do not use forums or a similar-model manual to set an interval.”
- **Maintenance journal agent:** “Turn verified source passages into draft tasks. For each task return asset ID, task description, trigger, source ID/page, acceptance criteria if stated, and whether a qualified service provider is specified. Flag unknown baselines, conflicting intervals and special safety conditions. Do not invent values, approve tasks, alter approved records or sign off work.”

Give agents read access to the necessary inputs and write access only to drafts. Do not send marina access information, logins or unrelated personal details to the agents.

## Review and rollout

1. **Confirm scope:** Collect the yacht’s registration and coding documents. Record the certified measurements, use and operating area rather than assuming the advertised dimensions determine the regime.
2. **Pilot:** Pick a few critical assets, for example the main engine, standing rigging, bilge pump/alarm, emergency steering and liferaft, if fitted. Capture nameplates, dates, certificates and available service records.
3. **Approve:** The skipper or designated maintenance lead checks identity, source applicability, trigger, service eligibility and last verified baseline. Refer technical or statutory uncertainties to the appropriate competent specialist or surveyor. Only a human moves a task into the live schedule.
4. **Operate:** Record meter readings and work as it happens. Review due and overdue items together with upcoming voyages, and keep a backup. Review source revisions when equipment is replaced or new instructions are issued.

For the maintenance principles behind these registers, see [IMO ISM Code, section 10](https://wwwcdn.imo.org/localresources/en/KnowledgeCentre/IndexofIMOResolutions/AssemblyDocuments/A.741(18).pdf) and the [IMO’s ISM Code overview and amendments](https://www.imo.org/en/ourwork/humanelement/pages/ismcode.aspx).

© SailingTarget. Designed By JoomShaper
  • SailingTarget
  • Home